亚洲国产精品视频一区二区三区,国产精品久久久久久粉嫩色,欧美日韩国产另类在线,亚洲乱码AV乱码国产精品

山東創(chuàng)圖建筑裝飾工程有限公司 山東創(chuàng)圖建筑裝飾工程有限公司
加工技術(shù)熱線:13165128506
  • 您當(dāng)前位置: 首頁>>新聞動(dòng)態(tài)>>行業(yè)動(dòng)態(tài)裝飾板墻面施工工藝是什么?

    行業(yè)動(dòng)態(tài)

    裝飾板墻面施工工藝是什么?

    來源:http://www.kcrft.cn/ 日期:2021-05-18 發(fā)布人:admin
    裝飾板墻面施工工藝是什么?外墻裝飾板是近幾年研發(fā)的新型建筑外墻裝飾保溫一體化材料;該材料由聚酯烤漆或氟碳漆、雕花鋁鋅合金鋼板、聚氨酯保溫層、玻璃纖維布復(fù)合而成;主要應(yīng)用于體育館、圖書館、學(xué)校和醫(yī)院的辦公樓、別墅等各種建筑的外墻裝飾和節(jié)能改造;主要功能為建筑裝飾、保溫節(jié)能、隔熱隔音、防水防霉。
    What is the construction technology of decorative panel wall? The exterior wall decorative panel is a new type of building exterior wall decoration and thermal insulation integrated material developed in recent years; The material is composed of polyester baking paint or fluorocarbon paint, carved aluminum zinc alloy steel plate, polyurethane insulation layer and glass fiber cloth; It is mainly used in the external wall decoration and energy-saving transformation of gymnasium, library, school and hospital office buildings, villas and other buildings; The main functions are building decoration, heat preservation and energy saving, heat insulation and sound insulation, waterproof and mildew proof.
    裝飾板墻面施工方法
    Construction method of decorative panel wall
    1、找位與彈線:木護(hù)墻板裝置前應(yīng)根據(jù)規(guī)劃圖集要求,事前找好標(biāo)高,平面方位、豎向尺度進(jìn)行彈線。
    1. Location finding and line snapping: before installing the wood wall panel, the elevation, plane orientation and vertical scale should be found in advance according to the requirements of the Planning Atlas.
    2、核對(duì)預(yù)埋件及洞口:彈線后查看預(yù)埋件,木磚或木楔是否契合規(guī)劃要求,擺放距離尺度、方位是否滿意釘裝龍骨的要求;量測門窗及洞口方位尺度是否方正筆直且與規(guī)劃要求是否相符。
    2. Check the embedded parts and openings: after snapping the line, check whether the embedded parts, wooden bricks or wedges meet the planning requirements, and whether the distance and orientation meet the requirements of nailing keel; Measure whether the orientation dimensions of doors, windows and openings are square and straight, and whether they are consistent with the planning requirements.
    3、鋪、涂防潮層:規(guī)劃有防潮要求時(shí)木護(hù)墻、木龍骨裝置必須找方、找直,骨架與木磚間的空地應(yīng)墊木墊,每塊木磚至少用2個(gè)釘子釘牢,再裝釘龍骨時(shí)應(yīng)預(yù)留出板面厚度。木龍骨與墻體接觸面要進(jìn)行防腐處理,其他三面進(jìn)行不少于三遍的防火涂料的處理。
    3. Lay and apply moisture-proof layer: when there are moisture-proof requirements in the planning, the wood parapet and the wood keel must be square and straight. The space between the skeleton and the wood brick should be padded with wood mat, and each wood brick should be nailed with at least 2 nails. When the keel is nailed, the thickness of the board should be reserved in advance. The contact surface between the wooden keel and the wall shall be treated with anti-corrosion treatment, and the other three surfaces shall be treated with fire retardant coating at least three times.
                   富美家裝飾板
    4、襯板裝置:在龍骨裝置結(jié)束后查看合格裝置15mm厚細(xì)木工板做襯板,要求襯板釘結(jié)實(shí),釘子的固定距離控制在200mm左右,反面刷防火涂料,拼接板之間應(yīng)預(yù)留5mm左右彈性縫隙,確保溫度變化的彈性量。
    4. Lining board device: after finishing the keel device, check the qualified device. The 15mm thick Blockboard is used as the lining board. It is required that the lining board should be firmly nailed. The fixed distance of the nails should be controlled at about 200 mm. The reverse side should be painted with fireproof paint. About 5mm elastic gap should be reserved between the splicing boards to ensure the elasticity of temperature change.
    5、安裝面板:面板選色陪紋:面板進(jìn)場使用前,按同房間、臨近部位的用量進(jìn)行挑選,是安裝后從觀感上木紋、顏色一致。
    5. Installation panel: select the color and texture of the panel: select the panel according to the consumption of the same room and adjacent parts before entering the site. It means that the wood grain and color are consistent from the appearance after installation.
    6、裁板配制:按龍骨排尺,大于龍骨間距進(jìn)行裁板,據(jù)裁后大面應(yīng)凈光(膠合板材嚴(yán)禁側(cè)凈),小面刮直。面板長向?qū)优渲茣r(shí)必須考慮接頭位于橫撐處,板背面應(yīng)做卸力槽,以防板扭曲變形,一般卸力槽間距為100mm,槽寬10mm,槽深6-8mm。
    6. Cutting board preparation: according to the keel layout, larger than the keel spacing for cutting board, according to the large surface after cutting should be clean (glued plate strictly prohibited side clean), small surface straight. When preparing the long butt joint of the panel, it must be considered that the joint is located at the cross brace, and the back of the panel should be provided with a force relief groove to prevent the distortion of the panel. Generally, the spacing of the force relief groove is 100 mm, the width of the groove is 10 mm, and the depth of the groove is 6-8 mm.
    7、面板安裝:面板安裝前對(duì)龍骨位置、平直度、釘設(shè)牢固情況、防潮層等構(gòu)造要求進(jìn)行檢查,合格后進(jìn)行安裝;面板配好后進(jìn)行試裝,面板尺寸、接縫、接頭處構(gòu)造完全合適,木紋方向、顏色觀感尚可的情況下,才能正式進(jìn)行安裝;面板接頭處安裝時(shí)應(yīng)涂膠與龍骨釘牢,釘固面板的釘子規(guī)格應(yīng)適宜,釘子長度約為面板厚度的2-2.5倍,釘子間距一般為100mm,釘帽應(yīng)砸扁,并用沖子將釘帽順木紋方向沖入面板1-2mm;釘貼臉:貼臉料應(yīng)進(jìn)行挑選、花紋、顏色應(yīng)與框料、面板近似。貼臉的規(guī)格尺寸、厚度應(yīng)一致,接茬應(yīng)順平無錯(cuò)槎。
    7. Panel installation: before panel installation, check the keel position, straightness, nailing firmness, moisture-proof layer and other structural requirements, and install after passing the inspection; After the panel is ready for trial installation, it can be formally installed only when the panel size, joint and joint structure are completely suitable and the grain direction and color appearance are acceptable; When the panel joint is installed, it should be glued and nailed firmly with the keel. The nail specifications for nailing the panel should be appropriate. The nail length is about 2-2.5 times of the panel thickness. The nail spacing is generally 100 mm. The nail cap should be smashed flat, and the nail cap should be punched into the panel 1-2 mm along the wood grain direction with a punch; Nail to face: the facing material should be selected, and the pattern and color should be similar to the frame material and panel. The size and thickness of the face shall be consistent, and the joint shall be smooth and smooth.

    Related products相關(guān)產(chǎn)品

    聯(lián)系我們

    產(chǎn)品銷售熱線:13165128506

    技術(shù)方案咨詢:18560211715

    倉庫地址:山東省濟(jì)南市天橋區(qū)金鑫產(chǎn)業(yè)園303倉庫

    九江工廠:九江市江東大道3號(hào)

    臺(tái)灣新竹工廠:臺(tái)灣新竹

    泰國曼谷工廠:泰國曼谷

    關(guān)注我們
    山東創(chuàng)圖建筑裝飾工程有限公司 備案號(hào):魯ICP備14019259號(hào)-2 網(wǎng)站地圖 XML TXT 魯公網(wǎng)安備37010502002020號(hào)

    截屏,微信識(shí)別二維碼

    微信號(hào):13165128506

    中文字幕亚洲中文字幕-丰满老妇伦子交尾在线播放| 久久网址一区二区精品视频-日产国产欧美视频一区精品| 99热在线精品免费6-av一区二区在线观看| 人妻互换精品一区二区-夜夜爽一区二区三区视频| 97人妻精品一区二区三区爱与-日韩精品亚洲专区在线观看| 午夜福利1区2区3区-午夜洗澡免费视频网站| 国产欧美日本一区二区-一区二区三区亚洲在线播放| 99久热精品免费观看四虎-亚洲天堂精品视频在线| 青青操视频在线观看国产-欧美成人乱码在线观看| 99精品只有久久精品免费-蜜臀一区二区三区精品久久久| 中文字幕精品一区二区日本99-青青国产成人久久91网| 国产成人精品亚洲精品密奴-国产成人AV无码精品| 欧美精品啪啪人妻一区二区-嫩草人妻舔舔羞羞一区二区三区| 中文字幕日韩不卡久久-五月天中文字幕啊av| 亚洲av高清一区三区三区-久久人妻夜夜做天天爽| 午夜福利卫生纸福利院-一区二区三区久久亚洲| 蜜臀av日日欢夜夜爽一区-av在线免费永久播放| 久久网站中文字幕精品-三级精品久久中文字幕| 国产精品二区高清在线-91精品91久久久久久| 国产精品熟女视频一区二区-国产日韩精品欧美一区喷水| 日韩国产一区二区三区在线-精品日韩人妻少妇av| 欧洲精品一区二区三区中文字幕-91久久国产综合久久蜜月精品| 哦啊好大用力欧美视频-麻豆国产传媒片在线观看| 久久精品国产亚洲av湖南-竹菊精品一区二区三区| 亚洲一区二区免费av-中文字幕人妻久久久一区二区三区| 亚洲最新国产无人区123-黄片一区二区在线观看| 欧美一级二级三级在线看-日韩精品欧美嫩草久久99| 国产综合日韩激情在线-日韩精品人妻一专区二区三区| 亚洲产国偷v产偷v自拍性色av-亚洲欧美日韩国产三区| 亚洲av专区在线观看国产-丰满人妻av一区二区三区| 亚洲综合av一区二区三区-高潮又爽又黄无遮挡激情视频| 国产精品美女在线网址-久草免费福利在线观看视频| 97香蕉久久国产在线观看-麻豆黄色广告免费看片| 一区二区三区女同性恋-熟妇高潮一区二区高清网络视频| 亚洲精品蜜桃在线观看-国产欧美日韩在线观看精品观看| 中文不卡一区二区三区-老司机在线老司机在线一区| 成人免费黄色在线网站-日韩精品一区二区三区四区在线| 一区二区三区日本韩国欧美-日本1区2区3区4区在线观看| 深夜三级福利在线播放-日韩精品一区二区在线天天狠天| 欧美精品午夜一二三区-a屁视频一区二区三区四区| 亚洲精品在线观看一二三区-在线观看国产中文字幕视频|